Shear Wall Failure Mechanisms
 

Lower Half of Wall & Window Sill
 


 

Nail withdrawal
 

Sheathing Movement

Notice the red lines on the OSB.  Prior to loading, these lines met in the middle of the wall and were parallel to the bottom of the wall.  Also note the separation of studs from sill plate.