Note the misalignment of
the sheathing at the top of the wall. The top plate can be seen where the
right hand panel has shifted with respect to
the framing. A gap between the two panels has also opened up.
A close-up of the above
picture, this image provides a good example of nail pull-through - one of
the failure mechanisms for this wall.